Project Update May 4: The contractor is working on the block between Tripp street and Egypt lane today. Tomorrow 5/5 they plan to be on David Drown Blvd. to do the drainage structure adjustments.
Then Wednesday 5/6 thru Friday 5/8 they plan to to do curb installation along David Drown Blvd., adjacent to the path, South street between pleasant and Adams street, and then curbing on Arsene street adjacent to the path.
Next week they will tentatively plan to jump to the Mattapoisett town line to begin working from the town line easterly. Portions of the path will be temporarily closed while they work; signage will be posted accordingly. Some sections will be left as gravel for a short period of time before paving large segments. This project will continue through the summer.